Coldwater Strong Long Leader Float Triple Rig 5/0 Shrimp Fly Kit

Sale price
$34.99


In stock! Usually ships within 24 hours.

Shipping Information

Our on-line store is open 24/7 and we ship Monday through Friday, excluding some holidays. Orders received for products without shipping restrictions on its product page will ship the same business day when received before 12:00 p.m. PST. Orders in high demand will have an estimated production time listed on its product page and will ship according to the date listed.

ggg

Coldwater Strong – Long Leader Float Triple Rig 5/0 Shrimp Fly Kit

  • Includes non-compressible float
  • Comes with a 3 shrimp fly leader rig
  • Includes 5 × 5/0 shrimp flies in multiple colors
  • Features 35 ft of 120 lb mono line for lead setup
  • Includes a Cuban hand reel for storing mono line
  • Built with high-quality terminal tackle
  • All connections are secured using pneumatic press crimps
  • Designed as a tangle-free, plug-and-play system — just attach mainline, add lead, and fish

You may also like

image

Easy Returns

Need to return an item? Check out our policy below
Return Policy
image

Lowest Price Guarantee

Find a better price? We'll beat it!
Price Match Policy