{"product_id":"coldwater-strong-long-leader-float-triple-rig-5-0-shrimp-fly-kit","title":"Coldwater Strong Long Leader Float Triple Rig 5\/0 Shrimp Fly Kit","description":"\u003cp data-start=\"439\" data-end=\"509\"\u003e\u003cstrong data-start=\"439\" data-end=\"509\"\u003eColdwater Strong – Long Leader Float Triple Rig 5\/0 Shrimp Fly Kit\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul data-start=\"511\" data-end=\"1017\"\u003e\n\u003cli data-section-id=\"1h2uilt\" data-start=\"511\" data-end=\"550\"\u003eIncludes \u003cstrong data-start=\"522\" data-end=\"548\"\u003enon-compressible float\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli data-section-id=\"cthahy\" data-start=\"551\" data-end=\"595\"\u003eComes with a \u003cstrong data-start=\"566\" data-end=\"593\"\u003e3 shrimp fly leader rig\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli data-section-id=\"euv3zy\" data-start=\"596\" data-end=\"652\"\u003eIncludes \u003cstrong data-start=\"607\" data-end=\"650\"\u003e5 × 5\/0 shrimp flies in multiple colors\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli data-section-id=\"od1bea\" data-start=\"653\" data-end=\"710\"\u003eFeatures \u003cstrong data-start=\"664\" data-end=\"693\"\u003e35 ft of 120 lb mono line\u003c\/strong\u003e for lead setup\u003c\/li\u003e\n\u003cli data-section-id=\"1jheo24\" data-start=\"711\" data-end=\"767\"\u003eIncludes a \u003cstrong data-start=\"724\" data-end=\"743\"\u003eCuban hand reel\u003c\/strong\u003e for storing mono line\u003c\/li\u003e\n\u003cli data-section-id=\"11g22cy\" data-start=\"768\" data-end=\"815\"\u003eBuilt with \u003cstrong data-start=\"781\" data-end=\"813\"\u003ehigh-quality terminal tackle\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli data-section-id=\"ace57m\" data-start=\"816\" data-end=\"880\"\u003eAll connections are secured using \u003cstrong data-start=\"852\" data-end=\"878\"\u003epneumatic press crimps\u003c\/strong\u003e\n\u003c\/li\u003e\n\u003cli data-section-id=\"m72cu9\" data-start=\"881\" data-end=\"1017\"\u003eDesigned as a \u003cstrong data-start=\"897\" data-end=\"934\"\u003etangle-free, plug-and-play system\u003c\/strong\u003e — just attach mainline, add lead, and fish\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Coldwater Strong","offers":[{"title":"Default Title","offer_id":51921786241388,"sku":"055","price":34.99,"currency_code":"USD","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0578\/9424\/0427\/files\/66685a_72346850c79d49daa24f5cc4fe34590d_mv2.avif?v=1774898634","url":"https:\/\/ascent-testing.myshopify.com\/products\/coldwater-strong-long-leader-float-triple-rig-5-0-shrimp-fly-kit","provider":"Master Store","version":"1.0","type":"link"}